Skip to content
Open Pre-registration: Hosur & Bengaluru Industrial SuperApp
SuperGig
Updated
SuperGig Plant · EV and batteries

Staffing for EV and battery plants in the Hosur and Bengaluru belt

SuperGig Plant lets an EV or battery plant post pack assembly, BMS, testing and kitting shifts by skill and level, and KYC-checked SuperGig Partners near the plant book them. Your high-voltage safety induction can run first, as a short course in the Partner app. SuperGig is not a manpower agency: it onboards plants directly, has no live shifts yet and promises no fill.

  • Pack assembly, BMS and test skills
  • Your safety video before the first shift
  • Verified ESD and hot-work certificates

A service business, not a plant?Register as a vendor

  • Pack assembly#1606 EV Battery Pack Assembly
  • BMS and testing#1409 and #1610
  • Harness and wiring#1603 Wiring / Harness Assembly
SuperGig Plant · Pre-book

Tell us the shifts your EV or battery plant needs

Leave your number. Our corridor team will reach you for further onboarding.

No company names

SuperGig does not name EV or battery makers and does not say who uses it. This page is for any plant in the belt that wants to post its own shifts.

Key facts

  • Tamil Nadu’s EV Policy 2023 calls Hosur the leading region for EV manufacturing.
  • Battery pack assembly is skill #1606 and battery and BMS work is #1409 in the app.
  • ESD handling and hot work or LOTO are certificates that count only after SuperGig verifies them.
  • The plant’s safety video becomes a short induction course with three questions.

How does an EV or battery plant get manpower by the shift?

The plant posts each shift itself in SuperGig Plant, and Partners near the plant book it. You name the role, the skills and their minimum level, the gate, the timing, how many people and the pay. SuperGig checks every public shift before Partners see it, and only Partners with every listed skill at that level or above can book.

The Tamil Nadu Electric Vehicles Policy 2023 says that “Hosur, in particular, has emerged as the leading region for EV manufacturing”. SuperGig began in the industrial hubs of Hosur and Bengaluru, and SuperGig Plant is open to plants anywhere in India. SuperGig is not the employer, contractor or staffing agency for anyone who books.

Which EV and battery skills can a plant post?

A battery or EV line needs kitters, assemblers, testers and technicians, and each is a numbered skill. Post them as separate shifts, so an assembler’s shift does not reach people who only kit parts.

  • Kitting and sub-assembly

    #1611 Sub-Assembly / Kitting Operator sets out cells, busbars and fasteners in kits for the line.

  • Pack and module assembly

    #1606 EV Battery Pack Assembly, #1603 Wiring / Harness Assembly, #1605 Soldering Operator and #1601 Assembly Line Operator.

  • Testing and inspection

    #1610 End-of-Line Test Operator for pack, motor and charger tests, and #1301 Quality Inspector (QC).

  • Battery and BMS technicians

    #1409 EV Battery / BMS Technician for testing and fixing packs and their battery management systems.

  • Automation and maintenance

    #1403 PLC / Automation Technician, #1407 Robotics / Cobot Technician and #1402 Industrial / Maintenance Electrician, which waits for a verified #2004 Electrical Wireman / Supervisor Licence.

Which skilled roles do EV and battery plants post?

An EV or battery plant can post skilled shifts for BMS, automation, instrumentation, utility and quality-system work. These are skills a plant can ask for, each a numbered skill in the SuperGig catalogue with its own page:

Set a minimum level, and write the battery pack or test station and your high-voltage rules into the duties. Each Partner starts a skill at L1 and moves up only through shifts completed on SuperGig, so first shifts go out at L1. Listing a skill does not mean someone with it will book.

How do I make sure shift workers know high-voltage safety first?

Add your safety video to the plant, and the Partner app turns it into a short induction course. The course is the video plus three standard questions, and you choose whether passing it counts as induction at your plant. Until someone has completed a shift at your site or you record their induction, they are not counted as inducted there.

List the certificates the work needs on the shift: #2017 ESD Handling Certified where boards and BMS electronics are handled, #2008 Hot Work / LOTO Certified for work on isolated equipment, and #2010 Fire Warden / Fire Safety Certified for the cell store. Each counts only once SuperGig has verified it, so only Partners with a verified certificate can book.

Safety stays with the plant

Insulated tools, PPE, cell storage, thermal-event drills and who may touch a live pack are the plant’s rules and the plant’s duty. SuperGig does not train or certify anyone for high-voltage work.

When does an EV plant need extra shifts?

Line trials, ramp-ups, model changeovers and dispatch peaks. A new line or a new model can be a multi-day run of up to 31 days, booked in one go; a steady second shift can be a weekly repeat; a rework or audit day can be a single shift.

Build a crew of the people who did well, and give them a window before a shift opens to everyone. Shift Health shows each upcoming shift as Fully booked, On track or At risk, judged on who has booked; no fill time is promised. For the rest of the electronics floor, read staffing for electronics plants.

Which services do EV and battery plants ask for?

Fire safety, electrical and climate control, quoted in the same app. Cell storage and charging areas make fire safety and electrical checks routine work for these plants. Describe the job in the Services tab, get a quote with its lines and a valid-until date, and accept the one you want; nothing is booked until you accept.

A plant in the belt can ask for a fire safety audit in Hosur, fire extinguisher refilling, an electrical audit and HVAC servicing.

What records do EV plant shifts leave, and how do I start?

The gate check, the clock times and the registers, from every shift. The guard checks each Partner’s rotating WorkPass at the gate, clock-in works only inside your geofence, and you approve each sign-off against them. The muster roll builds from clock-ins and the wage and overtime registers from approved sign-offs.

Posting a shift is free; a platform fee is charged on each completed shift. Set up SuperGig Plant for your plant. For the people who do this work, see EV and battery jobs in Hosur and Bengaluru.

Questions

EV and battery plant staffing: your questions.

Can’t find yours? WhatsApp us; we speak English, Tamil, Hindi, Telugu and Kannada.

How can an EV plant in Hosur get battery pack assemblers by the shift?
Post #1606 EV Battery Pack Assembly shifts in SuperGig Plant with the minimum level, the gate, the timing and the pay. KYC-checked Partners with that skill at that level who can reach the plant may book; no fill is promised.
Can I book a BMS technician for a line trial?
Yes. Post a #1409 EV Battery / BMS Technician shift, or a multi-day run for the length of the trial, and describe the work in the job description so Partners know before they book.
Does SuperGig check ESD or hot work certificates?
#2017 ESD Handling Certified and #2008 Hot Work / LOTO Certified are certificate skills that count only once SuperGig has verified them. List them on a shift and only Partners with a verified certificate can book it.
Who trains shift workers on high-voltage safety?
The plant. Add your safety video so the Partner app turns it into a short induction course, and brief people on the floor. SuperGig does not train or certify anyone for high-voltage work.
Which EV companies in Hosur use SuperGig?
SuperGig does not name EV or battery makers or say who uses it. For a company’s own vacancies, use that company’s careers page.
Is SuperGig a manpower agency for EV plants?
No. SuperGig is a marketplace: the plant posts shifts and Partners choose to book them. It is not the employer, contractor or staffing agency for anyone who books.

Tell us what your plant needs

Post pack assembly, BMS, test and kitting shifts by skill and level, with your safety induction first. Posting is free.

Tell us the shifts your EV or battery plant needs

Our corridor team will reach you for further onboarding, with a walkthrough of SuperGig Plant on your shifts and gates.

So we can match you to nearby shifts and send the right team. Optional; we save a rough point (about 100 m), never your live location.

For plants and factories. We’ll email you about your enquiry; you can ask us to stop any time. Prefer to talk now? Call +91 79969 95996 or WhatsApp us. Looking for work? Join as a Partner.

We use these details to reply to you. Read our privacy policy.

Talk to SuperGig on WhatsApp

First, tell us who you are. Your place is saved and you get your invite code.

I am…

A plant or employer Looking for work Other enquiry

So we can reach you if your number changes. No email? Leave it empty.

So we can reach you about setting up your plant.

We’ll email you about your enquiry. You can ask us to stop any time.

Share a friend’s number only if they agreed to be contacted by SuperGig.

What is it about?
Your top 3 skills 0 of 3

Pick up to 3, or skip for now. Popular skills first; search or browse all 259 for yours.

Not sure of your PIN code? Search “my PIN code” on Google, or ask us on WhatsApp.

Business type optional
What do you need? optional
Roughly how many people a month? optional
Experience
When can you work? (pick any)
Languages you speak (pick any)
Expected pay optional

What you hope to earn. Plants show the pay for each shift before you book.

You never pay to work here. Ever. No fees, no deposits, no agents.

Your app invitation codeSG-····

Sign up in the SuperGig app with this same mobile number: we’ll recognise you automatically and keep your priority access to shifts. Keep this code safe in case you use a different number.Sign up in the SuperGig app with this same mobile number: we’ll recognise you automatically and keep your priority access. Keep this code safe in case you use a different number.

Save our number as “SuperGig”: +91 79969 95996Save contact

Open in WhatsApp Follow SuperGig on WhatsApp for updates

Our corridor team will reach you for further onboarding.

Shifts and services are booked in the SuperGig Plant app. Shifts are booked in the SuperGig Partner app, not on WhatsApp.

Share on WhatsApp Follow SuperGig on WhatsApp for updates
Book a plant demo