Machine history card: one record per machine that keeps itself up to date
A machine history card is the running record of one machine: what it is, when it was serviced, what broke and what was done. In SuperGig Plant each machine gets that record in the Machines tab, with its service schedule, service records, breakdown history, photos and documents. A QR label on the machine opens it on the shop floor.
WhatsApp us on the same number
- Make, model, serial and criticality
- Services, repairs and breakdowns in one place
- A QR label on the machine opens its record
A service business, not a plant?Register as a vendor
- Machine registryMake, model, serial, line
- Service recordsService, inspection, repair
- Breakdown historyReported with photos
- QR labelScan to open the record
What should a machine history card contain?
Three parts: who the machine is, what has been done to it, and what has gone wrong with it. Most plants keep the first part as a header (name, asset number, make, model, serial number, location, date commissioned, how critical it is) and the other two as running logs that grow with every visit and every stoppage.
The table below is a general structure that maintenance teams commonly use, written from general trade practice. It is a starting point, not a standard: your quality system, your customer audits or your machine’s maker may ask for more columns, so add them.
| Section | What to record | Why it matters |
|---|---|---|
| Machine details | Name or asset number, make, model, serial number, site and line, date commissioned | Identifies the exact machine for spares, warranty and audits |
| Criticality | What happens to production if the machine stops | Decides which machines get serviced and repaired first |
| Service plan | How often it is serviced, the last service date, the next one due | Shows at a glance what is due or overdue |
| Service log | Date, kind of visit (service, inspection, repair, calibration), who did it, notes, cost | Proves the work was done and by whom |
| Breakdown log | Date and time it stopped, what was wrong, how urgent, what was done, when it restarted | Shows repeat faults and lost production time |
| Parts replaced | Part, quantity, date, who fitted it | Tracks wear parts and spares use |
| Documents | Manuals, drawings, test reports, calibration certificates, photos | Keeps the papers with the machine, not in a cupboard |
How does SuperGig Plant keep the history card for each machine?
Each machine you add to the Machines tab gets its own record, and that record is the history card. When you add a machine you enter its name, its kind (pump, motor, compressor, fan or blower, CNC machine, press, oven, boiler, conveyor, generator, chiller or other), the site and the zone or line, the make, model and serial number, the date it was commissioned and notes.
You also answer “How critical is it?”: Low (work carries on if it stops), Medium (slows work if it stops) or High (a line stops if it stops). Each machine shows a status: Running, Watch, Down or Retired.
The machine’s page then has a maintenance schedule, its service records, its breakdown history and its photos and documents, so the card your team used to keep in a file or a spreadsheet is on one screen.
- Maintenance schedule
Set “Service every N days” and the machine shows “Service due in N days”, “Service due today” or “Service overdue”.
- Service records
Log each visit as Service, Inspection, Repair, Calibration or Other, with the date, who did it, notes and the cost you enter.
- Breakdown history
Every breakdown reported for the machine stays on its page.
- Photos and documents
Keep manuals, reports and photos with the machine they belong to.
What should a machine breakdown report record?
When it stopped, what is wrong, how badly it hurts production, and who to talk to at the machine. A breakdown report format in Excel usually has columns for the machine, date and time of the stoppage, the fault, the action taken, the downtime and who fixed it. The weak point is that it is filled in late, from memory.
In SuperGig Plant, “Report a breakdown” asks for the machine, what is wrong, up to a few photos, when it stopped and how urgent it is: Line stopped, Running with a fault, or Can wait. You can add the line, a contact at the machine and a map pin. Partners on shift can report a breakdown too, so a stoppage on the night shift is recorded when it happens.
From the breakdown you can request quotes for the repair, and the report stays in the machine’s breakdown history. Read CNC machine repair for how a repair request works.
A good breakdown note says what the machine did (a noise, an alarm code, a leak) and what the operator was doing. The cause can be added after the repair.
How does a QR label help on the shop floor?
It puts the history card one scan away from the machine itself. SuperGig Plant prints a label for each machine, as a sticker or on an A4 sheet, or shares it as a PDF. The app’s own instruction: “Print this label and stick it on the machine. Anyone in your company can scan it with the SuperGig Plant app to open the machine’s record.”
A supervisor standing at a press can see when it was last serviced and what broke last month without walking to the maintenance office.
How do I move from an Excel history card to the app?
Start with your critical machines, set their service intervals, and log new work in the app from today. Add the High-criticality machines first, with make, model and serial number, then set “Service every N days” for each. Attach the last service report or the old card as a document so the history is not lost.
Machines sit next to the rest of SuperGig Plant: shifts, the gate check and services. For servicing on a schedule, see DG set, compressor and UPS servicing. For the crews that run the machines, see shift rosters for plants. Register your plant to start, or WhatsApp +91 79969 95996.
Machine history cards: your questions.
Can’t find yours? WhatsApp us; we speak English, Tamil, Hindi, Telugu and Kannada.
What is a machine history card in maintenance?
Is there a machine history card format in Excel I can copy?
Which fields does SuperGig Plant keep for each machine?
Can the app remind me when a machine is due for service?
Can workers on the night shift report a breakdown?
How is SuperGig Plant charged when I use it for machines and shifts?
Does SuperGig repair the machine itself?
Read next
- Shift rosters for plants Three shifts, crews first
- Safety induction for shift workers Before the first shift
- CNC machine repair A repair request from a breakdown
- DG set, compressor and UPS servicing Servicing on a schedule
- Equipment maintenance Quoted servicing and repairs
- SuperGig Plant Every module of the plant app
Related searches
Each search opens the SuperGig page that answers it.
Guides for plants
- how to hire factory workers in India
- how to reduce absenteeism in factory
- alternative to labour contractor
- contract labour management software
- attendance app for factory workers
- gate pass system for contract workers
- manpower for automobile industry
- manpower for electronics manufacturing
- warehouse staffing agency
- manpower for food processing plant
- manpower for garment industry
- manpower for EV battery plant
- manpower agency in Bommasandra
Tell us what your plant needs
Tell us how your plant keeps machine records today, and we will show you the Machines tab of SuperGig Plant.